Draft — needs my real artifacts before this goes live: the actual system shape (services, traffic numbers), the incident that section 5 describes, and the real timeline. Everything marked [TODO] is where the evidence goes. The strategy is the real one.

"We migrated to .NET Core" is table stakes. The interesting questions are: in what order, with what rollback plan, and what broke anyway. This is that story for [TODO: one-sentence system description — domain, rough scale, traffic].

Why migrate at all

.NET Framework 4.x is Windows-only, IIS-bound, and effectively frozen. The concrete costs we were paying: Windows licensing on every node, no containerization path, a cold-start and memory profile that made scaling expensive, and a growing list of libraries whose new versions were netstandard/net-only. The trigger was [TODO: the actual forcing event].

The strategy: strangler, not rewrite

The cardinal rule: the migration must never be the reason the system is down. That rules out big-bang. The approach:

  1. Inventory by dependency, not by size. Every project graded on its blockers: System.Web coupling, WCF, third-party packages without netstandard targets, Windows auth, registry/GAC assumptions. The grade — not business importance — set the order.
  2. Shared code to netstandard2.0 first. Class libraries were retargeted while still consumed by the Framework host. Weeks of work shipped to production with zero runtime change — the safest possible way to burn down the biggest risk.
  3. Route-by-route strangler at the reverse proxy. The new Core host went up beside the old one behind the same proxy. Endpoints moved one route group at a time; the proxy decided who served what. Rollback for any route = one config line, seconds, no deploy.
  4. The database didn't move. Same schema, same data, both hosts pointing at it. One migration at a time — runtime or storage, never both.

The rollback plan is the deliverable

Every cutover step had a written, tested rollback before it ran:

  • Proxy config in git; reverting a route was a one-line revert, applied in seconds.
  • Both hosts ran identical health endpoints; the proxy only sent traffic to green.
  • Session/auth state was made host-agnostic before any route moved ([TODO: what it actually was — cookie unification, data-protection keys, etc.]), so a user could bounce between old and new hosts mid-session without noticing.

Uptime through the whole program: [TODO: measured number] — the 99.9% in the title, from the same monitoring that predated the migration, not a retrospective estimate.

What broke anyway

The honest section. Things the inventory missed:

  • Config binding semantics. web.configappsettings.json looks mechanical, until code that read ConfigurationManager.AppSettings at static-initialization time started seeing nulls under the new host's startup order. Found in staging; fixed by pushing all config reads behind injected options.
  • Culture-sensitive string behavior. Framework-on-Windows and Core-on-Linux disagree on some culture defaults ([TODO: the actual case — sorting? date parsing?]). A silent data-ordering difference, caught by a diff-testing harness replaying production reads against both hosts.
  • [TODO: the real incident] — the one that made it to production. What the alert looked like, how the route-level rollback contained it in minutes, what the permanent fix was.

What I'd generalize

  • Order by blocker, not by value. The scariest dependency defines the critical path.
  • Never migrate runtime and storage in the same step.
  • Rollback that needs a deploy isn't rollback. Proxy-level cutover made reverting cheaper than debating whether to revert.
  • Diff-test reads before cutting writes. Replaying real traffic against both stacks finds the disagreements no test suite was written to catch.

The same philosophy runs this site: health-gated deploys, SHA verification, and rollback as a first-class step — just at portfolio scale.